Siemens needed to install switchgear to convert electricity generated by this new 140-turbine offshore windfarm to 33kVA for transfer to the National Grid. It also required transformers to supply low-voltage power to various equipment on site.

Solution

Portastor robust, secure equipment housings offered a quality-assured solution to the project’s tight timescales. Portastor provided a full turnkey package, from design to installation, supplying three 11 x 3.2m buildings, each housing six switchgear panels, a transformer and an automatic voltage regulator. The buildings feature high-security extra-wide doors to accommodate the large equipment.
The galvanised steel substructures for each building were installed by Portastor on site. The buildings were supported 1.5 metres above ground level to allow incoming cables to be fed easily into them, with no need for time-consuming and costly excavations, and to protect the sensitive equipment from flooding.
Following the success of this project, Siemens contracted Portastor to provide similar equipment housings for its London Array Windfarm and Gwynt Y Mor Windfarm in Wales.

01 Siemens Greater Gabbard Windfarm, Suffolk

Read case study

02 Scottish Power/Community Windpower

Read case study

03 Rose Cottage Farm – CG Power Solutions

Read case study

Industry News from Around the World

News Aggregator

© Portastor quality assurances conforms to ISO 9001 +44 (0)845 6011 2762 Portastor, Portsilo, Portakabin, Porta, LX Plus and Shepherd Group are registered trademarks.

Portastor Limited. Company Registration No 6956110 (England & Wales)